Customer Satisfaction
Walking Tunnel
- Cumberland Valley School District
- Connects the campus of Winding Creek Elementary School to Mountain View Middle School
- Post tensioned with conduits and junction boxes roughed in for lighting
- Multi section wing walls
Princeton Health Care Campus
- Designed to be cast in place but Monarch took on the challenge to submit a precast alternative, offering cost and time savings to the contractor
- 32 foot long sloped outlet structure weighing over 30 tons
- 8 point lift
- Precast outlet box, frost footers and sloped sections all delivered and installed with the assistance of Monarch Products
- Custom made 35’ long aluminum trash rack with cast in mounting pockets
Park City Wegmans – Crossings at Conestoga Creek Box Culvert
- Custom outlet control end sections
- Over 15’ wide
- Dual escorts required
- Culvert and End sections delivered and installed with the assistance of Monarch Products
Flow Through Planters
- Custom designed by Monarch to meet the customer’s needs
- Flow through planter box with built in trench drains
- 25 Feet Long
- Over 25 Tons each.
- 32 built and Delivered by Monarch Products
Architectural Endwalls
- Layout and design by the team at Monarch Products
- Custom formliners carefully installed in our formwork
- Detailed accents added through custom painting